Transcript
1 Http://www.EasyBGA.com
BGA Rework Station
User Manual
Beijing TECHNICAN CO.,Ltd.
ACHI®
࣫Ҁ⋄ܟሐỂᡔ᳝└݀ৌ ACHI® Ѯˮ Ѯˮ Ѯˮ Ѯˮ
2 Http://www.EasyBGA.com
Brief introduction to company
Safety Instrouctions
I. Electric Safety
II. Operation Safety
III. The operation and conservation condition of products
Our contact information
product guarantee and so on
The parameters of IR-PRO-SC BGA Rework Station
hardware description and Self-help install
Set Bottom Temperature Controller
Programmer/Controller General Description
BGA Rework operation steps
Prompt
࣫Ҁ⋄ܟሐỂᡔ᳝└݀ৌ ACHI® Ѯˮ Ѯˮ Ѯˮ Ѯˮ
3 Http://www.EasyBGA.com
Brief introduction to company
Beijing TECHNICAN Science and Technology Co.,Ltd. is a manufacturing
enterprise specializes in BGA manual Reworks equipment research,development and
production . ACHI/Ѯˮ Ѯˮ Ѯˮ Ѯˮ® is our company's registered brand.Based on the principles of
producting high-quality and cost-effective welding equipment,our company has
developed and producted a number of BGA Rework Stations,such as IR-3ǃ ǃǃ ǃIR3000 ǃ ǃǃ ǃ
IR6000ǃ ǃǃ ǃHR-PRO etc.,and has been recognized by the majority of users in practice.So
far,our users have been involved in scientific research units,computer maintenance and
repair of medical equipment,communications equipment maintenance,video game
maintenance, training teaching, and other fields.
We also produce and operate some assistant and materials of manual BGA
welding,such as customized BGA Reballing Template,solder ball, Flux,etc.,to help users
streamline operation,improve the success rate of welding,and reduce welding costs.We
also can undertake single or small quantities BGA welding business,welcome users to
contact us.
In the future,our company will continue serving users with sophisticated
products,reasonable price,high quality,and continuously innovating and upgrading
product structure and performance according to market,for meeting the developing
needs of our users,and providing the users with systemic,comprehensive and thoughtful
services.
࣫Ҁ⋄ܟሐỂᡔ᳝└݀ৌ ACHI® Ѯˮ Ѯˮ Ѯˮ Ѯˮ
4 Http://www.EasyBGA.com
Safety Instrouctions
.Electrical safety ĉ ĉĉ ĉ
Make sure the supply power voltage accord with the standards----
220V-250V/50hz alternating current before installing.
To avoid possible electric shock caused serious damage, please disconnect the
power cord from the outlet temporary before moving machines .
If the machine damages,please contact us for maintenance.If the damage
caused by the users when they dismantle or repair independently,they should
take on the loss by themselves.
. Operating safety Ċ ĊĊ Ċ
Please carefully read the relevant information provided by the manual before
starting using this product .
Make sure the power cord has been properly connected properly before using
the products.
Installed the equipment in stable work platform to use,where the air mobility
should be small as possible.Avoid it closing to air conditioners,fans and the
other outlet.
In case of electrical short-circuit,avoid the products contacting with water.
Forbid using this equipment in flammable and explosive substances.
The operators’ hands or other parts of the body should maintain a safe distance
from the heater.Forbid touching the heater to avoid scalding.
If you have any technical questions or suggestions in the course of using this
product,please contact with our technology department.We will try our best to
solve.
.Environmental requirements of operation and conservation ċ ċċ ċ
1. Operation environment of products
Operation temperature:15 ~ 45 ć ćć ć
Operation humidity:5% to 95%, non-condensing
Products should be kept in the air mobility of a smaller environment under the
welding operation.
2.Conservation environment of products
Storage temperature:-20 ~ 70 ć ćć ć
Storage humidity: 5% to 95%, non-condensing
࣫Ҁ⋄ܟሐỂᡔ᳝└݀ৌ ACHI® Ѯˮ Ѯˮ Ѯˮ Ѯˮ
5 Http://www.EasyBGA.com
Contact us
Add: Room 8009,
1 Xicaochang Road
Haidian District
Beijing 100080
The People's Republic Of China
Sales Support: 86-10-82853468 (Chinese Speaking)
Technology Support: 86-10-82851031(Chinese Speaking)
QQ˖ ˖˖ ˖448764790 759577566 MSN˖ ˖˖ ˖
[email protected]
URL.˖ ˖˖ ˖http://www.EasyBGA.com
product guarantee and so on
Service Statement:
Enjoy warranty maintenance service for three years,in which the service in the first
year is free.And the transport costs arise from maintenance should be paid by the
buyers since purchased..
Only the actual cost of spare parts should be paid from the beginning of the second
year(the 13th month)to the end of the third year (the 36th month) since purchased.
Please call to ask the specific prices of spare parts.And the transport costs arise
from maintenance should be paid by buyers.
Each product corresponds to the only serial
number,the serial number bar code,the
warranty certificate ,affixed the fixed position of
the machinery,.
Please send the product to the Beijing
TECHNICAN CO., if fault happen.
If the following situations occered,the users will not be entitled to free warranty
service,then the maintenance,the cost of materials and the man-hour will be charged.
So to ensure your rights, please read the following note carefully:
No serial number bar code or damaged serial number bar code.
Cause damage for not use,keep and storage as the manual.
Cause internal and external appearance damage by modify or outside force.
Product was deformed or lost components.
Change product components without our authorization for maintenance.
Beyond the warranty period of our promises..
Product damage were caused by irresistible external factors(such as natural factors,
earthquakes,lightning strikes,etc.)
Note: Do not disassemble it by yourself,it may cause the invalidation of product
guarantee. . We reserve the final identification right of the product fault.
࣫Ҁ⋄ܟሐỂᡔ᳝└݀ৌ ACHI® Ѯˮ Ѯˮ Ѯˮ Ѯˮ
6 Http://www.EasyBGA.com
The parameters of IR-PRO BGA Rework Station
Basic Parameters
Heating Upper Dark IR / Bottom IR
Dimension L 475mm mm mm
Weight 27kg
Total weight About 29 kg, vary with the differen need of the
users
Electrical Parameters
Power 220V AC
Upper Heating Dark IR
Size of Upper heating 80mm 80mm
Consumption of upper heating 400W
Bottom Heating IR
Size of Bottom heating 260 mm mm
Consumption of Bottom
heating
1600W
General power 2100W
Temperature Control
Control mode of Upper
PLC programmable logic controller,
precision ± 0.5%, Alarm
Control mode of Bottom Iindependent temperature control, high-precision
closed-loop control, precision ± 0.5%, NO Alarm
Rework Function
SMD Suit for welding,remove or repair packaged devices
such as BGA,PBGA,CSP,multi-layer substratesˈ ˈˈ ˈ
EMI metallic shield product and solder/lead free
Rework ǃ ǃǃ ǃwelding
Size of applicable chips İ İİ İ70mm 70 mm
Size of applicable PCB İ İİ İ400mm mm
࣫Ҁ⋄ܟሐỂᡔ᳝└݀ৌ ACHI® Ѯˮ Ѯˮ Ѯˮ Ѯˮ
7 Http://www.EasyBGA.com
Hardware description
ACHI® IR-PRO-SC BGA Rework Station is composed of upper part of Heating
Components / Bottom Preheat Module / PCB Table / Temperature Control Parts !
Temperature control Table is control the upper and lower heating ,Can Simultaneously
heated or First preheat ,then the upper part of heating.
1. Upper Heater
2. X-axis Regulator
3. LED Auxiliary Lighting
4. Y-axis Lifting Regulator
5. Bottom Heater (Pre-Heater)
6. PCB Table and locking handle seat
7. Cooling Fan
8. Start button
9. Emergency Stop button
10. Cooling switch
11. Lighting switch
12. Upper Fan switch
13. Bottom Temperature Controller
14. Upper Programmable Temperature Controller
࣫Ҁ⋄ܟሐỂᡔ᳝└݀ৌ ACHI® Ѯˮ Ѯˮ Ѯˮ Ѯˮ
8 Http://www.EasyBGA.com
switch selector for Bottom Heater Module
PCB Table
࣫Ҁ⋄ܟሐỂᡔ᳝└݀ৌ ACHI® Ѯˮ Ѯˮ Ѯˮ Ѯˮ
9 Http://www.EasyBGA.com
Set Bottom Temperature Controller
PV˖ ˖˖ ˖Display window of actual temperature.
SV˖ ˖˖ ˖Display window of setting temperature.
Press the SET button of Bottom temperature control instrumentation for 1 seconds,then
the PV window to show SU.
The SV window to show current setting temperature, And the adjustable number flashes.
Press key ġ ġġ ġ Ģ ĢĢ Ģ to adjust temperature,ˈ ˈˈ ˈPress key ˘ ˘˘ ˘ to modify the valueDŽ DŽDŽ DŽ
After the setted ˈ ˈˈ ˈPress the SET button for 1 seconds,save the current temp.
࣫Ҁ⋄ܟሐỂᡔ᳝└݀ৌ ACHI® Ѯˮ Ѯˮ Ѯˮ Ѯˮ
10 Http://www.EasyBGA.com
Programmer/Controller General Description
The programmable controller contains an in-built setpoint generator in addition to the
controller function. This setpoint generator can produce a temperature/time profile with
10*16 segments (0̚9ˈ10 Sets of Curves). When the program is running, the current setpoint
from the setpoint generator is fed to the control algorithm. The current setpoint is
continuously shown on the lower display.
The sixteen segments are defined in the order: Ramp 1, Dwell period 1, Ramp 2, Dwell
period 2..., and are executed in succession.
S.N. Item Functions
Parameters setting key
(Up key) Increase value ķ ķķ ķ
(Down key) Decrease value
Selects the program pattern number
Starts/hold the program, changes the mode from fixed value
control to program control
Program parameters setup
ĸ ĸĸ ĸ
Changes the indication on SV/MV/TIME display
Ĺ ĹĹ Ĺ OUNT Output indicator
ĺ ĺĺ ĺ STEP Indicates the step number of program
Ļ ĻĻ Ļ PRO
(Program monitor indicator)
During program control, ‘ ’ is lit when the PV is rising
During program control, ‘ ’ is lit when the PV is constant
During program control, ‘? ?? ?’ is lit when the PV is falling
ļ ļļ ļ PTN
(Pattern number display)
Indicates the pattern number ‘0̚ ̚̚ ̚9’
Ľ ĽĽ Ľ RUN (Program control runing indicator)
࣫Ҁ⋄ܟሐỂᡔ᳝└݀ৌ ACHI® Ѯˮ Ѯˮ Ѯˮ Ѯˮ
11 Http://www.EasyBGA.com
The LED indicator is lit during program control
ľ ľľ ľ PV
(PV Display)
Indicates the Process/Measured value
Ŀ ĿĿ Ŀ SV
It is lit when the Setting Value(SV) is being displayed on the
lower display
ŀ ŀŀ ŀ
TIME
MV
SV
(SV/MV/TIME display)
It indicates the Setting Value(SV), Manipulating Value(MV), or
Time(TIME)
(The display content can be changed by the ‘DISP/SELECT’
key)
AL1 It is lit when the Alarm1 output is ‘ON’
Ԣ ԢԢ Ԣ
COM
(Communication indicator)
It flashes when the controller is in active communication with a
host computer
Program Parameters Setting
Ramp Rate1:
A ramp consists of a slope(linear gradient) and a target setpoint. The control setpoint
increases or decreases at a linear ramp rate from the actual measured value until a specified
target setpoint is reached. The relative positions of the actual measured value and the target
setpoint determine whether the slope of the ramp is positive or negative. Parameters R1, R2,
R3... express the ramping rate in unites per minute(0.01~99.99), parameters L1, L2, L3... the
appropriate target setpoint in display units.
If R1 = END, the program will be ended when the program runs to the slope.
Target Setpoint 1:
The target value to which the setpoint ramps when the programmer has been placed into
RVN.
Dwell period 1:
In a Dwell period, the target setpoint, which has been attained, remains unchanged for a fixed
period. All the dwell periods are defined by their duration in minutes with parameters D1, D2,
D3...(0~9999). When the program is running, these parameter display the time remaining in
the active dwell period. If the parameter equals zero, the dwell period is skipped.
When the controller runs in the PV displaying status:
1). Select the target program pattern number with the PTN/ key.
2). press SET/PROG key, the first program parameter appears in the upper display. The
value associated with this parameter will be shown in the lower display.
3). Use ▲ and ▼ key to modify the value.
4). Press the PAR/SET key, the next parameter appears. At the same time, the modification
has been saved in the memory. Use ▲ and ▼ key to modify the value.
Repeat this procedure till all the parameters are set. Or if there is no key operation within 16
seconds, the menu times out automatically.
࣫Ҁ⋄ܟሐỂᡔ᳝└݀ৌ ACHI® Ѯˮ Ѯˮ Ѯˮ Ѯˮ
12 Http://www.EasyBGA.com
Program Parameter List
̚ǃ
̚
̚ǃ
̚
Ă Ă Ă Ă
࣫Ҁ⋄ܟሐỂᡔ᳝└݀ৌ ACHI® Ѯˮ Ѯˮ Ѯˮ Ѯˮ
13 Http://www.EasyBGA.com
Rework Operation Steps
1ǃ ǃǃ ǃBe all set
ķ ķķ ķ Fixed motherboard
ĸ ĸĸ ĸ Shift sensor ˈ ˈˈ ˈsensor press close to BGA chipDŽ DŽDŽ DŽ
Ĺ ĹĹ Ĺ Adjust the height of heating head with adjustment knob˄ ˄˄ ˄Prompt˖ ˖˖ ˖BGA chip in the middle of
heating head ˈ ˈˈ ˈheating head away from BGA chip≥2CMDŽ˅ DŽ˅ DŽ˅ DŽ˅
࣫Ҁ⋄ܟሐỂᡔ᳝└݀ৌ ACHI® Ѯˮ Ѯˮ Ѯˮ Ѯˮ
14 Http://www.EasyBGA.com
2ǃ ǃǃ ǃStart heating
Select the appropriate temperature program segment,
then press the start switch. In the operation can press the Emergency stop switch,
stop operatingʽ ʽʽ ʽ
3ǃ ǃǃ ǃ After the program runs, automatic Alarm˄ ˄˄ ˄8 SECONDS˅ ˅˅ ˅, and automatically cut
off the heating power, this time you can check the following solder ball is
completely liquefied, BGA chips should be subject to settlement, floating state .
࣫Ҁ⋄ܟሐỂᡔ᳝└݀ৌ ACHI® Ѯˮ Ѯˮ Ѯˮ Ѯˮ
15 Http://www.EasyBGA.com
3ǃ ǃǃ ǃHeating completed
1ǃ ǃǃ ǃ Moving Heating head and Sensor ,open the Upper fan and Cooling Fan Switch
2ǃ ǃǃ ǃ Remove motherboard ˈ ˈˈ ˈClear insulating tapeʽ ʽʽ ʽ
3ǃ ǃǃ ǃ BGA Rework Station Cooled ,Then close Total Powerʽ ʽʽ ʽ
Warning˖ ˖˖ ˖
If BGA Rework Station NO Cooling ˈ ˈˈ ˈDo not close the Power !
When the temperature is not cooled, Do not touch heating module!
࣫Ҁ⋄ܟሐỂᡔ᳝└݀ৌ ACHI® Ѯˮ Ѯˮ Ѯˮ Ѯˮ
16 Http://www.EasyBGA.com
Prompt
1ǃ Installed the equipment in stable work platform to use where the air mobility should be small as
possible .Avoid it closing to air conditioners, fans and the other outlet.
2ǃ ACHI® IR-PRO-SC Rework Station sensor Direct contact with motherboardˈSo Temperature
display is Actual temperatureDŽ
3ǃ In order to avoid damage to the motherboard capacitorˈso use insulation tape please ˈ
Maintenance completed ,then Removal of insulation tape ˈSo as to avoid short-circuitʽ
4ǃ After removal of BGA chip ˈPCB Bonding Pad Need to clean up ˈAvoid cold solder joint See
BGA chip tin completely liquefied, Then To move the BGA chipˈSo as to avoid Bonding Pad
Damage ʽ
5ǃ BGA chips should be subject to settlement, floating state Prohibited in all solder ball did not fully
liquefied, by force if removal of chips, so as to avoid pad off, chip or motherboard scrap!
6ǃ To improve success rate of Rework , PCB and chips need drying and processing in principleˈ
PCB board or chip moist heat process will occur in the burst phenomenon, the Rework process
may hear the blasting sound of a minorDŽAccording to actual situation Pleaseˈself-control.
7ǃ PCB board heating time is too long or repeated several times the surface heating will lead to
discoloration.
8ǃ Users from modifying temperature parametersˈPlease use scrap PCB testedˈ Heating whole
time about 10 seconds before the end of solder balls should be fully liquefiedˈf the liquefaction
advanced or delayed,ˈʽShould be regulating up/down the temperature setting. So as to avoid heat
damage to chips or low-temperature sealing-offDŽ
9ǃ The factory equipped with two sets of programmable temperature control table used parameters:
PTN-1˖Lead Rework
PTN-2˖Lead-Free Rework
Rework temperature curve to set examples
Lead : Sn63Pb37
PTN- 1
r1 1 L1 85 d1 80
r2 1 L2 150 d2 55
r3 1 L3 185 d3 45
r4 END
Lead-Free:
Sn96.5Ag3Cu0.5
PTN- 2
r1 1 L1 85 d1 60
r2 1 L2 140 d2 45
r3 1 L3 170 d3 35
r4 1 L4 220 d4 40
r5 END
࣫Ҁ⋄ܟሐỂᡔ᳝└݀ৌ ACHI® Ѯˮ Ѯˮ Ѯˮ Ѯˮ
17 Http://www.EasyBGA.com
1/The meaning of“ Hb”:
“Hb” means the max heating temperature of the upper heating. We set the max
temperature at 230°C according to the max temperatrue of lead-free Reweork and
other technical reasons. The data needn’t to be changed.
2/The meaning of “r1” “L1” “d1” “r2” “L2” “d2” “r3” “L3” “d3” ……
Please pay attention to The following pictures and tables:
S.N. Mnemonic Parameter Adjustable Range
1 r1 Ramp Rate 1 1
2 L1 Target Setpoint 1 0̚230ǃEnd
3 d1 Dwell Time 1 0̚9999sec
4 r2 Ramp Rate 2 1
5 L2 Target Setpoint 2 0̚230ǃEnd
6 d2 Dwell Time 2 0̚9999sec
7 r3 Ramp Rate 2 1
8 L3 Target Setpoint 2 0̚230ǃEnd
9 d3 Dwell Time 2 0̚9999sec
… … … …
Hb 230
Rework temperature curve to set examples
Lead Sn63Pb37
PTN- 1
r1 1 L1 85 d1 70
r2 1 L2 150 d2 35
r3 1 L3 185 d3 50
r4 END Hb 230
Lead-Free
Sn96.5Ag3Cu0.5
PTN- 2
r1 1 L1 85 d1 60
r2 1 L2 140 d2 45
r3 1 L3 170 d3 25
r4 1 L4 220 d4 50
r5 END Hb 230
࣫Ҁ⋄ܟሐỂᡔ᳝└݀ৌ ACHI® Ѯˮ Ѯˮ Ѯˮ Ѯˮ
3/ Please check Rework station surrounding environment, as far as possible away from
the air outlet and other sources.
4/ Do not open upper fan in the welding process,
5/ Just remember that:
The max tempertature of lead rework is approximately 183 ć ćć ć,
˄ ˄˄ ˄Reflow temp:185ć ćć ć̚ ̚̚ ̚190ć ćć ć , Reflow time: 10 Sec˅ ˅˅ ˅
that of lead free is approximately 217 ć ćć ć.
˄ ˄˄ ˄Reflow temp:220ć ćć ć̚ ̚̚ ̚225ć ćć ćReflow time: 15 Sec˅ ˅˅ ˅
6/ No matter you click "Run" in the IRSOFT or Push the “start switch” on the control
board ˈ ˈˈ ˈRework station will be autorun current program segment in the
Temperature Controller!
So you must Select the appropriate temperature program segment in the
“PTN ”windows, or You can downloaded IRSOFT’data to the controller, covered,
then run.
18
www.thebgastore.com